Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
How to tie roll roofing into a shingle roof.
It was a small.
If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
A very important detail is where the flat roof is connecting the pitch roof.
The flashing should double lap the roll roofing.
The first layer should cover the roof as far as the chalk line.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
Place the first layer of rolled roofing on the roof.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
Push the rolled roofing down into the wet cement to secure it to the roof.
The problem is that the porch roof doesn t go under the eves or to the peak of the existing house it ties into the 4 12 roof about half way up.
Everything should lap just like shingles.
3 tab shingles are the most common type of shingle they are typically 36 inches long in total.
Dbower for a roof that new tinner pretty much summed it up.
Roofing nails to the existing structural sheathing.
The most trusted miami roofing contractor professionally describes the installation of thi.
This video shows the transition of a shingle roof to a metal roof.
String the line along the top of the frame until it meets the shingle roof.
As you place the rolled roofing down stretch it to get rid of wrinkles and creasing.
Even though the higher roof was installed first the end result.